Loading...

pdf Gfa ad 518 issue 1 Popular

By Tagged in ASH26E 1017 downloads

Download (pdf, 151 KB)

gfa ad 518 issue 1.pdf

Gfa ad 518 issue 1

INSPECTION AND EXCHANGE OF THE MUFFLER

The high grade steel plate of the earlier mufflers turned out to be insufficiently resistant for the inner areas. One muffler showed cracks in the inner area after about 45 hours of operation. A superior material has been used since 1996 and the stronger mufflers are marked with an X at the front plate. Alexander Schleicher Technical Note ASH 26 E No. 8 which herewith becomes part of this AD.