pdf Gfa ad 158 issue 2 Popular
By Tim Shirley Tagged in SZD-9bisBocian 894 downloads
gfa ad 158 issue 2.pdf
PERIODIC INSPECTION REQUIREMENTS
Applicable to the SZD-9 bis Bocian 1D and 1E. Issue 1 of this AD required the periodic inspection of the fuselage carry through and the wing root fittings. The Technical Bulletin under which this AD was issued was replaced by Bulletin BE-20/80 Bocian which simplified the inspection required. This AD has therefore been reissued and consideration has also been made of the fact that the GFA requires detailed Daily and Annual Inspections. PZL-Bielsko Bulletins BE-20/80, BE-21/81 Bocian and BE-27/86 Bocian refers.